KitLog pro

Powered By Kitlog Pro v2.0

LOU'S WEB SITE
' style=
Date:  5-16-2010
Number of Hours:  2.50
Manual Reference:  Pg 6-4
Brief Description:  Drilling the Vertical Stabilizer

Finally back to work after a long winter. Match drilled two holes in the VS-410PP upper hinge to spar. Reamed the remaining four holes.

Fluted the VS704-707 ribs to straighten. Emery clothed the edges to smooth.
' style=

Final Drilling Hinge

Final Drilling Hinge

' style=

Fluting Ribs

Fluting Ribs

' style=

Deburring Ribs

Deburring Ribs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.