Powered By Kitlog Pro v2.0
LOU'S WEB SITE
RV-7A
All
5-16-2010
< Previous Log Entry
Next Log Entry >
Date:
5-16-2010
Number of Hours:
2.50
Manual Reference:
Pg 6-4
Brief Description:
Drilling the Vertical Stabilizer
Finally back to work after a long winter. Match drilled two holes in the VS-410PP upper hinge to spar. Reamed the remaining four holes.
Fluted the VS704-707 ribs to straighten. Emery clothed the edges to smooth.
Final Drilling Hinge
Fluting Ribs
Deburring Ribs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
43
158
Empennage
42
158
Tools
1
0
Copyright © 2001-2024 Matronics. All Rights Reserved.