Powered By Kitlog Pro v2.0
N983LK
RV-8
Fuselage
5-15-2016
< Previous Log Entry
Next Log Entry >
Date:
5-15-2016
Number of Hours:
5.00
Manual Reference:
Brief Description:
Match drilling and finishing up the drilling the u
Riveted the fwd and aft halves of the F811 bulkhead together and clecoed it in the tailcone in place of the bad one.
Final drilled the LH mid side skin and the aft side skins.
Match drilled the remaining holes common to the tail cone skins and upper longerons.
Longeron drilling completed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.