KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  3-9-2016
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Drilled holes in avionics access door doubler.

Laid out and drilled the rivet hole locations in the avionics access door doubler. Match drilled the holes from the doubler to the upper baggage bulkhead. Opened up five of the holes to # 19 for # 8 screws. Drilled rivet holes for nut plates at each of those five locations. Deburred all holes drilled tonight.

Deburred the edges of the upper baggage doubler.
' style=

Doubler clecoed to the upper baggage bulkhead.

Doubler clecoed to the upper baggage bulkhead.

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.