Brief Description: Drilled holes in avionics access door doubler.
Laid out and drilled the rivet hole locations in the avionics access door doubler. Match drilled the holes from the doubler to the upper baggage bulkhead. Opened up five of the holes to # 19 for # 8 screws. Drilled rivet holes for nut plates at each of those five locations. Deburred all holes drilled tonight.