Finished match drilling the RH tank attach zees to the RH spar. Drilled the zees for the nut plates and countersunk the nutplate rivet holes. Primed the zees.
Installed the nutplates on the LH splice plate
Built the stall warning switch assembly to be mounted in the LH wing.
Primed tanks attach zees and stall warning switch plates