Powered By Kitlog Pro v2.0
N983LK
RV-8
All
6-3-2021
< Previous Log Entry
Next Log Entry >
Date:
6-3-2021
Number of Hours:
3.00
Manual Reference:
Brief Description:
Oil cooler
Installed an Adel clamp and link to secure the prop oil line to the engine.
Installed the ignition wire grommets in the aft baffles.
Installed the oil fittings in the oil cooler and bolted the oil cooler to the baffles, Connected the oil lines to the oil cooler.
Fittings in oil cooler
Oil cooler in place
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.