Powered By Kitlog Pro v2.0
N983LK
RV-8
All
2-11-2021
< Previous Log Entry
Next Log Entry >
Date:
2-11-2021
Number of Hours:
1.50
Manual Reference:
Brief Description:
Baffles part 7
Drilled a 1 inch hole in the RH inlet baffle and support angle for clearance of the propellor oil line.
Deburred the components for the inlet baffles.
Riveted the air damns on the inlet baffle support angles.
Attached the inlet baffles to the engine.
RH inlet baffle
Hole for prop oil line
LH inlet baffle
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.