Rivet oil cooler additional support brace. Cut 3/4" hole in aft L baffle CB-706A for magneto cooling blast tube. Rolled front edge of CB-1002A forward L air ramp. Trimmed edges of lower front L cowl lip for clearance. Installed snorkel and lower cowl. Check for clearance good. Finally!! Drilled out forward clip CB-702P and installed with flush rivets on bottom side for airbox attachment. Installed all snorkel and support nutplates. Manufactured VA-132-1C and VA-132-1D inboard and outboard filter holdown brackets. Installed snorkel, filter, baffles and lower cowl. All clear!!