KitLog pro

Powered By Kitlog Pro v2.0

Joe's OneX #129 Project
' style=
Date:  7-15-2013
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Drilled ribs and hinge for right elevator

Drilled ribs and hinge for right elevator: Because of BO'ed ribs, I cannot drill all the ribs for the empennage control surfaces but I am drilling what I can and drilling the hinge to the control surfaces. When drilling the hinge to the control surface it is important to keep the control surface flat else you may build in a warp.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.