Returning from vacation, I dived into the project today ! I did 3 main things:
1. Re-routed the flexible fuel line to loosen up the 180 degree turn ... this time, it seems to be much better. Anyway, this is how it will be for the first engine run ....
2. I worked on adjusting the canoppy front pins hinge . I did not like the pin position and the retraction was not optimal. I re-cut a tube in T6060 material to figure the exact hole position. Now I need to re-order one 4130 steel tube 3/8" X 0,035" and redo it exactly. This time after much trials, it works perfecty.
3. I cut the network cable to proper length. This made a much cleaner "behind the panel" look and makes the sapce available not completly clogged out. Dynon network cable length for my setup are definitely way too long. To test it all out, I had to re-install the screens !
I will order what I am missing and hopefully that next weekend I will complete the top forward skin riveted down ! I am getting closer but it is not going super fast !