KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  5-18-2019
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Various

I did a few things today. See description below pictures. Hopefully my fuel tank should be finish within a few weeks. Also not shown, I installed the fuel level sensor and tested them.

I have ordered the fuel pickup tube from Vans but they have not arrived yet.
I also bought extruded hinges for the flaps from Aircraft Spruce to replace those that came with the kit; flaps works hard and I have been told that sometime on the inboard side, they tend to brake. I also I bought the Andair fuel valve. Finally I bought from Flyboy, a gascolator. I know I am early but I like to prepare myself ahead rather than wait at last minute.
' style=

Proseal touch up

Proseal touch up

' style=

Cutting out bottom outboard skin

Cutting out bottom outboard skin

' style=

cutting out the aileron fairing

cutting out the aileron fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.