KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-18-2024
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Checking the empenage

A leap to the past ! I pulled out from a 5 years storage all the empenage parts. I did not finished them completely. I had to foin the leading edge which was a thougher job than I tought. Then I added the counter weight and checked the fiberglass tip. Some were missing nut plates and all of them need to close the end that is open. That will be for tomorrow.
' style=

showing the elavator leading edge

showing the elavator leading edge

' style=

Rudder & both elavators

Rudder & both elavators

' style=

Fiberglass not even drilled !

Fiberglass not even drilled !

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.