KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  4-3-2024
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Completing some tasks to get it ready for paint

Today I completed the install of the Ray Allen flap positionner. It went fairly well but I attached the clevis to the flaps torque tube instead of the long arm because it is more a direct line with the movement. Using Hobby RC control links worked quite well. I used a 4-40 rod and 2 plastic clevis.

Then I proceeded to the tail and cleaned it up not as nicely as the tunnel because there are wires coming from every direction. I will look at it again tomorrow. Last I secured the pitch servo and tightened all the bolts as well.
' style=

Hard to see but it is there

Hard to see but it is there

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.