KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  4-1-2024
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Little things

Today I kept attaching loose wires and paid special attention to the tunnel and ensured all wires were on the side , tie wrapped and secure on the rib. Clean job, I like it .

I also cut the carpet I bought, primed the sides of the luggage area and tomorrow I will temporarily install it to see what it looks like.

I then re-installed the canopy top center locking handle with a little system where the handle cannot rotate freely and lock you outside by inadvertance. It look shitty on the picture but there will be a cover over it so you will not see what I am showing in the picture

Last, I cut and drilled the ends on the push rod 3/4" F689 . Tomorrow I will prime it before sliding it in the tunnel.
' style=

Clean tunnel (forward end) ...

Clean tunnel (forward end) ...

' style=

Little anti rotation system for the canopy top handle

Little anti rotation system for the canopy top handle

' style=

F689 ends being drilled

F689 ends being drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.