KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  3-20-2024
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Cockpit work

Today I had to re-do 2 fuel pipes to make a much cleaner area under the fuel selector. I installed at this lowest point the flyboy gascolator and to do the piping was a frustrating work ! You can see the numerous attempts in doing this task. The tube bender is quite hard to use properly and it took me several attempts and material to finally make it right . Tomorrow I will be moving between the seats.
' style=

Attempts collected !!

Attempts collected !!

' style=

Fuel pump all connected with the gascolator and the valve selector.

Fuel pump all connected with the gascolator and the valve selector.

' style=

The other side

The other side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.