KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  3-14-2024
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Spinner final drilling

Drilling the bulkheads to final size and drilling the holes for the nutplate to install. Then deburring all the holes on both side.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.