KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  3-7-2024
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Spinner fiberglass work

Today I worked on the spinner by adding a supporting ring for the forward bulkhead. The instructions provide 3 ways of doing this and I am doing a combo of two: a fiberglass ring with bondo to finish the installation. My fiberglass ring is very close to the required inside diameter and I will use some bondo to complete the installation as per Vans aircraft suggestion.

Also not in the picture, I have attached the guiding side plate of the cowling as shown yesterday.
' style=

Marking the location of the desired ring

Marking the location of the desired ring

' style=

some fiberglass strips ready

some fiberglass strips ready

' style=

After several passes , the thickness is just shy of 3/8

After several passes , the thickness is just shy of 3/8"

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.