Powered By Kitlog Pro v2.0
Jean RV6 Construction Log
RV6
All
1-8-2024
< Previous Log Entry
Next Log Entry >
Date:
1-8-2024
Number of Hours:
10.00
Manual Reference:
Brief Description:
Baffle
Worked partially over the last3 days. I have finalized installing permanently the oil cooler and completed the metal part of the baffles.
Oil cooler in place
Bottom oil cooler hose route
Metal part of baffles installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV6 Home
Category
# Logs
# Hours
All
397
2710
Cowling
24
221
Empennage
22
110
Engine
17
115
Fuselage
141
1163
Instruments
34
297
Other
2
18
Propeller
7
39
Wings
150
747
Copyright © 2001-2024 Matronics. All Rights Reserved.