KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  1-8-2024
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Baffle

Worked partially over the last3 days. I have finalized installing permanently the oil cooler and completed the metal part of the baffles.
' style=

Oil cooler in place

Oil cooler in place

' style=

Bottom oil cooler hose route

Bottom oil cooler hose route

' style=

Metal part of baffles installed

Metal part of baffles installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.