KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  12-18-2023
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Baffle

The last 2 days, I couldn't work full time but only partially. All I did was riveting the prepared back end of the baffle and attached them final on the engine since they are ready to receive the rubber. Next I will assemble the forward side and will adjust the nose of the cowling.

The cables for the spark plug fromn the mechanical mag are smaller that the cable holder I bought. This will need some sealing to plug it all up as it has 3 access holes but I only need 2.
' style=

Cable pass through (blue nylon)

Cable pass through (blue nylon)

' style=

Structure for the oil cooler.

Structure for the oil cooler.

' style=

Other side ....

Other side ....

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.