KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  10-14-2023
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Baffles

The pictures of the work are representative ... Working alone require to be abble to support the bottom cowling and I made that lttle dolly to help supporting it while testing the baffles fit.

I completed a few riveting parts and also added the tubing around the bolts holding the oil cooler as well as installing the air flow controlling panel held by those bolts as well. I passed the cable but not final because I am missing a pass through on the firewall.

Finally I started trimming the baffle, slowly ....
' style=

rudimentary dolly on wheels

rudimentary dolly on wheels

' style=

oil cooler with air control panel

oil cooler with air control panel

' style=

baffle trimming

baffle trimming

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.