KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  8-20-2023
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Scoop , louvers & errands

Although not having a full weekend, I manage to do things that shows which gives me the impression that my project moved forward.

I've done many irritants such as doing a concrete bucket so I can level securely the aircraft. The hinge that I fiberglassed and riveted last weekend would not go back together because some epoxy resin invaded space it shoudn't and required cleaning them out. Small space is very challenging to remove the epoxy.

I also received the bigger scoop , the right scoop for my 360 engine and manage to secure it in place. I cut out the bottom cowling and I only have to do the epoxy.

I also installed the louvers and the only last thing to do on them is to rivert them.
' style=

concrete filled bucket

concrete filled bucket

' style=

Hinge cleaning required

Hinge cleaning required

' style=

Scoop & louver

Scoop & louver

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.