KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  6-26-2023
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Drilling hinges

Yesterday, I managed to drill out most hinges. I still have to drill the top firewall hinges & add the two small center cowl 4" hinge but the progress is evident.

There was a lot of heating some area and force it it's place and it works. But in the co-pilot side forward left opening, I over heated and a piece of the top finish bubled up and detached itself. Nothing dramatic but lesson learned !

The cowling position seems to be perfect. I also temporary place the scoop to get a view of the overall look. And that please me.
' style=

Left

Left

' style=

Overall look

Overall look

' style=

Right

Right

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.