KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  3-12-2023
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Completing various things !

I have done too many small things this weekend to show it all in 3 pictures. Here is a list that I am writing so I can remember .... what I did !

1. completed the wiring --- was missing the cabin lights connection & the defog fan connection
2. completed the Dsub on the VPX ... enclosure installed over the Dsub & secured them in place
3. Connected the oil temp sensor
4. plugged holes in the firewall due to a cable route changed.
5. Cut down the sticks by 2 1/2" to eliminate the throttle interference
6. Trimmed the firewall to prepare installing the top cowling.
7. Installed the brake lines (not completed yet)

I plan to do some this week so next weekend I can rivet the forward top skin final.
' style=

brake lines

brake lines

' style=

shorten both sticks

shorten both sticks

' style=

Firewall hole plugged !

Firewall hole plugged !

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.