Long day with little to show. I started by raising and levelling the fuselage. Not evident in my small garage by myself ! But I managed and squared the wheels . You can see the red angle in the second picture that was attached to both main shaft for aligning the wheels. Then I squared it with the lazer beam and a square.
Drilling each hole took an hour. Now I have to assembled the wheels , brakes to be able to bring the engine home soon.