KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  11-20-2022
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Gear leg drilled in place

Long day with little to show. I started by raising and levelling the fuselage. Not evident in my small garage by myself ! But I managed and squared the wheels . You can see the red angle in the second picture that was attached to both main shaft for aligning the wheels. Then I squared it with the lazer beam and a square.

Drilling each hole took an hour. Now I have to assembled the wheels , brakes to be able to bring the engine home soon.
' style=

Fuselage first time up in the air !

Fuselage first time up in the air !

' style=

Aligning the wheels ,,,,

Aligning the wheels ,,,,

' style=

Gear locked in place

Gear locked in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.