KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  9-25-2022
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Wiring continuing

Today I managed to connect pretty much everything that was left except the flap switch. Since I am missing the new rubber tiewrap, most wires have not been secured permanently.

I also added the second grounding block in the engine compartment. Since the other one is full (32 pins block), I am sending some ground to the engine side. Those are not connected yet as I am waiting for the engine to me in place prior of connecting them because O am unsure about the wires routing.

As you can see, around the VPX, all wires are routed around it. Although it look like a mess, it is indeed an organised mess. The majority of the wires are color coded and some have marking on them.I have made the decision to have an access panel, quite large in case some day one need to work in that area.

Aside the flap switch, prior of getting the engine installed, here is a list of tasks that need to be done: Securing all wires, installing loops to secure the control cables, completing the connection of the sticks, And then, I will get the engine !
' style=

All switches wired

All switches wired

' style=

second grond block, engine side

second grond block, engine side

' style=

Lots of wires around the VPX

Lots of wires around the VPX

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.