KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  7-3-2022
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Wirring ... tiring !

I caught the COVID. Because of it we cancelled a pool party that we were hosting. The good side is I regained energy on saturdy and was able to put a few hours. Sunday I added an other 6 hours .

It is not wiring that is difficult, it's the routing of all the wires. The wire mess is cleaning out slowly. I have reinstalled the throttle & mixture controls , conected the Nav lights & the strobes, installed the TNC on the RG400 cable going to the Garmin GPS175 and finally shorten the 15 feet network cable by a good 4 feet and routed it properly and connected it to the network hub.

I go very slow because there are so many consideration to take care about. After all, in the early '90 , there were not as much wiring to do and beside , this RV6 will be IFR rated.
' style=

Controls reinstalled

Controls reinstalled

' style=

Wiring clean out

Wiring clean out

' style=

Network reconnected.

Network reconnected.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.