KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  5-15-2022
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Wiring continuing & other

Productive weekend although I could only put 3 hours yesterday. I managed to connect my Aithre CO2 detector, my USB, installed my rudder / brake system, riveted the two air scoop on the fuselage sides, etc ....

The first picture display the braking lines connections and above the second pedal from the left, you can see the parling brake device on the firewall.
The second picture is showing that my first ground block is almost at maximum capacity.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.