KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  5-8-2022
Number of Hours:  35.00
Manual Reference:  
Brief Description:  Wiring continuiing

I did not work 25 hours but this is the cumul (probably very conservative) of the previous weeks because my social life is interfering with my construction.

I have kept on wiring, soldering, fishing the wires, figured where to pass all these wires & cables. I have used both holes already provided in the bulkhead and added one at the to center for routing all the wings wires . I have also installed my stick grips and it looks pretty good to my liking.

Now I will re-install the center console , gas tubing and all for completing the wiring. I still need to finish drafting my electrical plan, although it is already done, it is not in a nicely and orderly manner. The only wires not there yet are those for the flaps motor and the RayAllen position sensor, and the fuel pump. Everything else is passed and might need to be connected but I am pretty confident about my work. I shall see that soon.

One thing that I am pretty happy with is all audio shielded cables have been routed alone, not coming close to any other wire . For that , I am pressy pleased !
' style=

Ray Allen stick grip

Ray Allen stick grip

' style=

RS400 coax cable & right wing wires

RS400 coax cable & right wing wires

' style=

Bundle to cententer of bulkhead

Bundle to cententer of bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.