KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  4-3-2022
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Wiring continuing

Even if you know where to pass each wires, you still have to pass it. And the tail is not a fun place to work in, specially for a guy of my size !

But I managed to install the 2 servos, connecting them to a hub along with the 2 ADAHRS. With this I ran the 15 foot cable that will run between that last hub that I am refering to, to the hub up front behind the panel. From there, that last hub will be connecting the screen and other elements that will be part of the network.

As you can see in the 1st picture, I am using the center canal to run many wires along with the network cable and the manual trim cable. Note that all wires are not secured yet ... The yellow wires bundled up are for the CWS of the auto-pilot.

Next weekend I will prepare the wires for the wing nav lights , landing lights, pitot heat For those, I will run them alond the top side of the ribs and they will cross the forward side of the spar in the center top of the bulkhead. Along with many wires, they will run beside the fuel lineall the way to the firewall where they will go up to get their connecting point ... VPX, or ground bus.
' style=

Co-Pilot side wires run under floor

Co-Pilot side wires run under floor

' style=

Hub--connecting point

Hub--connecting point

' style=

Network cable from ADAHRS to Hub

Network cable from ADAHRS to Hub

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.