KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  2-13-2022
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Preparing for wiring

The position of the instruments on the sub-panel, despite my planning does not work as well as planned. I will have to reposition some of those because the harness behind the screens are too big and needs room.

I debated about installing the PPS but elected to delay it until the engine is bolted on. I find quite challenging to decide where to put things without everytthing being there.

I also noticed that I forgot to install the push pull cable to control the trap controlling the oil cooler air mount getting to it. I will need to plan for it ASAP.

I have position my VPX between the firewall and sub-panel. I think that location is ideal. I am also planning to make an access hole on the last forward top skin tohave access behind the sub-panel. I've seen a few with quite large holes . Mine will be not too big yet they will allow to see and use tool behind the sub-panel.

I think that organising properly will payoff in the long run. I am progressing slowly now as I do not want to make a mistake ... I will have to do a lot of readings this week ....
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.