KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  11-21-2021
Number of Hours:  14.00
Manual Reference:  
Brief Description:  Preparing for canopy installation

This weekend I did a lot of deburring , priming again. I also dismantle the panel to prepare it for final riveting and painting while waiting for the dry transfer print to arrive in early December.

I did not have much to show in pictures but soon the canopy area shall be riveted. I installed the locking brackets for the canopy and serach for the parts to complete the installation. So far I reterive everything except a little bent plate that attach the bracket to the pushrod mechanism.

One thing that took me a long time this weekend, about 3 hours, was to remove one screw that was holding the radio face plate. That screw was stripped and I had to take extreme precaution to not scratch anything. Frustrating as the hexagonale hole because of the paint became a source of major frustration.

This week, I will do a few hours to debur and if weather permits, I will prime outside.

I am anxious to start installing the canopy and would like to have it started before mid-December.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.