KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  5-29-2021
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Finisihing drilling / positionning inside cabin

Yesterday I did not work too much but managed to pretty much complete everything that is inside the cabin. As you can see on the first picture, to protect the fuel line that protrudes before exiting, I made a small cover . The fuel tank air line were done and needed to be put in place but until the forward skin top riveting is done, I cannot finalize this task. Under the airplane in blue is the vent for the air line of the fuel tank from JD Air. I like the look of them !

Although I am almost done, there are a few things that remains; wires, throttle & fuel cables, routing the elevator trim, all the engine probe instruments wiring, .... but at least a big chuck of the inside is done.
' style=

Cover over the fuel line .

Cover over the fuel line .

' style=

Fuel tank air line

Fuel tank air line

' style=

Nice fuel air line intake !

Nice fuel air line intake !

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.