KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  4-25-2021
Number of Hours:  16.00
Manual Reference:  
Brief Description:  Various

This weekend many little things are done. One is the seats back are completed , primed and riveted. Then I cut out the handle, drilled the air scoop in the front. I also drilled and riveted the cap that goes over the F604 bulkhead.

While doing all of this, I tried to figure how to realign properly the canopy frame. I think after many test, I found a solution but for this te be tried, the deck needs to be riveted in place. Because of this, I proceeded in installing the canopy deck but that means I must completely finish the sub panel first, which is drilled but not ready to be install immediately.

I had a lot of debate about the order of installing things .... and I am still unsure. This week I shall order my Dynon suite .... I am still debating where to buy it but I will make my decision this week.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.