Today was a good productive day. I have been procrastinating about attaching the roll bar which I finalized today. The biggest challenge was to thread in the nut with those bolts in a confined space ! But with patience a little bit of duck tape , it finally worked.
I have also drilled the UHMW parts and installed them for the seat belt cable. Tiny work that takes time to fix.
I also drilled the baggage area back wall .... not complex but to do it right you got to take the time. Tomorrow I will add a 8 X 12" door to it to ease access to the bell crank, ELT & the other equipment that will be installed behind that wall.
Finally I also trimmed the the top skin except where the window will be going.