Powered By Kitlog Pro v2.0
Jean RV6 Construction Log
RV6
All
11-1-2020
< Previous Log Entry
Next Log Entry >
Date:
11-1-2020
Number of Hours:
8.00
Manual Reference:
Brief Description:
Continuing drilling
Not much to say. Drilling holes takes a long time as there are many holes to drill. I finished drilling the rear skins and then proceeded on the bottom skin under the seats and luggage area.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV6 Home
Category
# Logs
# Hours
All
399
2725
Cowling
24
221
Empennage
24
125
Engine
17
115
Fuselage
141
1163
Instruments
34
297
Other
2
18
Propeller
7
39
Wings
150
747
Copyright © 2001-2024 Matronics. All Rights Reserved.