Like everything I do, it always takes more time than I expect. Part of Saturday and most of Sunday, I drilled in place the floor ribs and the baggage ribs.
Since I had an older kit, the baggae ribs were too long between 1/8" to a 1/4" .... which of course took more time to fix. But in the end the 23" between F606 and F605 has been respected.
What I am surprise of, is the bulkhead as I add them fit perfectly in hight, sit on the main longeron perfectyly. No adjustment has been required ...
Now I am dreaming of starting skinning and flipping that thing over.