Powered By Kitlog Pro v2.0
Jean RV6 Construction Log
RV6
All
12-1-2018
< Previous Log Entry
Next Log Entry >
Date:
12-1-2018
Number of Hours:
4.00
Manual Reference:
Brief Description:
LW tank pro-sealing parts
I pro-seal parts of the left wing tank and let them sit for the remainning of the day.The picture shows them after the riveting and pro0sealing the rivet shop head.
Angles riveted
This is a cap with a key
tank drain valve
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV6 Home
Category
# Logs
# Hours
All
397
2710
Cowling
24
221
Empennage
22
110
Engine
17
115
Fuselage
141
1163
Instruments
34
297
Other
2
18
Propeller
7
39
Wings
150
747
Copyright © 2001-2024 Matronics. All Rights Reserved.