KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  2-25-2018
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Drilling & deburring LW top skin & LE

Lots of work for very no visible change .... finished drilling the under side of the LE skin of the LW. Then dismantled LE and both top skins ...and deburred . Finally, organized my small space area for next weekend .... it is surprising how tools gets spread out all over the place !

I use a deburring cutting tool mounted in an air drill, I set pressure very low, like 10 psi and it works well although this is quite boring task that has to be done.,,,no way around it.

Next weekend, I plan to debur the ribs and spars. Then I will dimple all those holes. Then I plan in priming all the inside of the skins, reinstall everything on the structure of the wing. Finally, I think I should have time to rivet the LE skin on the ribs ...

If this goes as plan, I will start working on the fuel tank in 2 weekends.
' style=

Deburring hole with a drill set at very low pressure

Deburring hole with a drill set at very low pressure

' style=

A picture of my flight yesterday morning ...

A picture of my flight yesterday morning ...

' style=

Mild day ... look at the ice buildup in the river !

Mild day ... look at the ice buildup in the river !

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.