KitLog pro

Powered By Kitlog Pro v2.0

Gregs RV-7A Site
' style=
Date:  2-19-2011
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Elevator- right- mock up and prep

I clecko'd the skin and frame together on the right elevator and then drilled everything and took it all apart. I then deburred, dimpled and prepped all the surfuces for priming.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.