KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  11-29-2020
Number of Hours:  8.00
Manual Reference:  33-6,7,8,9
Brief Description:  Seat floors, baggage floors and rear bulkhead

Riveted rear seat pans and baggage floors to ribs per plans.
Installed nutplates on baggage floor inboard edges and rear flange as indicated.
Riveted the F1023B baggage floor angles to baggage floors and mid side skins.
Riveted the upper and lower baggage door seal channels and shim to skin and bulkheads per plans.
Riveted the F1027 closeout panel to rear bulkhead and lower door seal channel.
Clecoed RH baggage wall cover to bulkheads.
Marked holes on fwd flange of F1028 center baggage bulkhead channel.
Clecoed tailcone fwd top skin in place.
Temporarily installed baggage bulkhead with screws in bottom row then match drilled remaining holes into baggage bulkheads.
Installed upper baggage bulkhead and repeated for remaining screw holes.
Checked RH baggage wall cover panel for proper alignment then match drilled to baggage floor, rear bulkhead and fwd fuse longeron. Final drilled nutplate rivet holes on fwd end of baggage cover.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.