Using riveting diagram in plans riveted fwd fuse top skin to ribs in sequence shown. Riveted upper instrument panel flanges to skin. Riveted hand hold doublers. Temporarily attached instrument panel lower flange and panel to upper fwd fuse sub assembly. Set assembly aside to be final riveted to fuse structure later.