KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  10-4-2020
Number of Hours:  6.00
Manual Reference:  29-20, 21
Brief Description:  Fwd cabin floor pans and gear brackets

Installed a layer of Koolmat and fiberglass insulation below floors and in tunnel floor.
Riveted floor panels in place per plans.
Fabricated 4 ea. spacers from tubing as instructed and installed both main landing gear mount fittings with indicated hardware.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.