Brief Description: Aft deck and stab support angle
Riveted the F1011B stop doubler to aft deck. Temporarily installed F1011D attachment support bar and match drilled to horizontal stab attachment bars with #30 drill. Final drilled to #12. Deburred then riveted support angle to doubler and aft deck. Installed and torqued AN-3 hardware as indicated. Installed optional tail tiedown eyebolt.