KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  3-25-2017
Number of Hours:  3.00
Manual Reference:  10-4,5,6
Brief Description:  Bulkhead fabrication, longerons and stringers

De-burred and fluted as required the F1006, F1007, F1008 bulkhead frames.
Match drilled all common holes of frame sections with #30 drill.
Enlarged the two rudder cable holes in frame F1007 with unibit to 5/8" as indicated.
Marked all J-stiffeners as indicated with edge marking tool.
Bent R-L longerons 2 degrees down as shown on plans to match side skins.
' style=

Match drilled frames

Match drilled frames

' style=

Edge marking J-stiffeners

Edge marking J-stiffeners

' style=

2 degree bend in longeron

2 degree bend in longeron

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.