Installed corrugated conduit in both wings for wire runs. Installed wiring for nav/strobe and landing lights. Installed CPC connector brackets and tye wrap bases on both OB ribs for nav/strobe. Installed coax coupler, snap bushings, and RG400 coax for marker beacon in LH wing.