KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  4-18-2022
Number of Hours:  3.50
Manual Reference:  21-10, 22-8, 44-5
Brief Description:  Flaps and ailerons installation

Installed flaps and trimmed IB edges as required to fit fuselage contour and to gain proper clearance.
Trimmed flap pushrods to size and installed rod ends with tabbed lock washers on each end.
Set flap motor to full retract and adjusted pushrods per manual.
Installed pushrods and performed ops check of flaps system.
Installed ailerons.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.