Powered By Kitlog Pro v2.0
Greg's Bearhawk Build
Bearhawk 4
Fuselage
5-7-2016
< Previous Log Entry
Next Log Entry >
Date:
5-7-2016
Number of Hours:
7.50
Manual Reference:
Brief Description:
Nose bowl
Fabricated the c channels that hold the nose bowl in place. Fabricated 8 3 inch steel doublers that go on the end of each channel to attach to the firewall and the nose bowl. Cut them to length and drilled and clecoed them in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk 4 Home
Category
# Logs
# Hours
All
85
436
Empennage
2
4
Engine
24
128
Firewall
7
33
Fuselage
33
200
Interior
13
56
Miscellaneous
4
7
Wings
2
8
Copyright © 2001-2024 Matronics. All Rights Reserved.