KitLog pro

Powered By Kitlog Pro v2.0

Jasons Thatcher buildlog
' style=
Date:  3-15-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Powdercoat and rollbar

Powdercoated the speedbrake, fabbed the brackets and installed on fuselage. Moter drives it nicely. Bent the conduit for the roll bar. First tried the bender but the die was too large and flattened the tube slightly. I cut a plywood round slightly smaller than the desired radius to allow for springback, clamped it to the table and it bent perfectly by hand!
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.