Fabricated and tapped the control rods for the rod end bearings. Riveted the rear cockpit floor. Aileron torque tube slides due to binding of it's rod bearings. David Thatcher said to make small spacers (had a 20 minute conversation with him on the phone). Also discussed issues with measurement of ribs, some parts are spec'ed too small.